Twenty days before hitting the raod.

The time for us to hit the road is drawing close.The excitement is building in our household.There are only twenty or so days left for us to finish up everything here.
Yesterday Johan from A.N.Blinds came to the bus to take the measurements for the rolling blinds that we decided on. The blinds will take tow weeks.
We have at long last signed a contract on a self storage unite.It is unbelievable how expensive these thing are.We are paying R480.00 per month for a 3x6M unite. So now we can slowly move our stuff to the store room.
We all so gave the go ahead to the carpenters to make the lounge suit smaller so that it will not take up all the space in the lounge.I hope thy don't mess it up.
It feels like there is still so much to do on the bus although the in side is 95% done we still need the electrical side connected up.I normally get along with most people, but the electrician that we contracted to do the electrical side of the bus,is a different story.I cant really say what it is that makes me feel the way I do but I can not stand the man.Unfortunately for me he must come back to the bus to finish up the electricity.